Phase 1: Preparing the Ground
Phase 2: Installing the frame 
Phase 3
: Furnishing


Phase 1: Preparing the Ground

The ground is cleared and levelled.

The ground is cleared and levelled.

The frame is made from old pallets.

The frame is made from old pallets.

Holes are drilled into offcuts of old branches.

Holes are drilled into offcuts of old branches.



Phase 2: Installing the frame

The frame is installed.

The frame is installed.

Another tier is added.

Another tier is added.



Phase 3: Furnishing

The completed product ready for ten-ants,or whatever other insects move in.

Susan creates the completed product ready for ten-ants,or whatever other insects move in.

Meanwhile Katie refurbishes the paths with shingle.

Meanwhile Katie refurbishes the paths with shingle.


Insect houses bought for the garden 22 Apr 2017

Insect houses with metal rooves for protection.