Herb Tablet Project

As part of the revamping of the garden area, the 'herb tablet' is a project provisionally to make use of the 'cartwheel' as a focal point and possibly memorial. The stages to completion are outlined below along with a diagram. The committee have decided to site the tablet in the lower area of the garden close to the greenhouse. The earlier site at the side of the house has been rejected due to the overhanging trees which are liable to minimise required light.

Prospective herb tablet layout [Dec 08]

FEB 2009: The funding for the project has now been made available and we are hoping to implement it soon.

Thanks to Paul Heaton for the project plan.

Phase 1: 15/03/09
Phase 2: 29/03/09
Phase 3
: 29/05/09
Refurbishment:10/03/12


Phase 1: Preparing the Ground

Paul and Lee at work on the herb tablet project, preparing and levelling the ground. Paul and Lee at work on the herb tablet project, preparing and levelling the ground.
Paul digs out the edge to provide support for the log rolls. Paul digs out the edge to provide support for the log rolls.
The string marker is temporarily moved to render the ground relatively level. The string marker is temporarily moved to render the ground relatively level.
Inserting support for the log rolls. Inserting support for the log rolls.
A slight interlude to entertain a visitor. A slight interlude to entertain a visitor.
On with the work of preserving the log rolls. On with the work of preserving the log rolls.
Caught red handed!

Caught red handed!

Meanwhile Susan paints primer to the semi-circular wheel in two halves ready to be set in place. Meanwhile Susan paints primer to the semi-circular wheel in two halves ready to be set in place.


Phase 2: Installing the Wheel

Paul prepares the supports for the tablet.

Paul prepares the supports for the tablet.

The first half of the tablet is maneuvered into place.

The first half of the tablet is maneuvered into place.

Carefully does it!

Carefully does it!

Minor adjustments made to ensure fitting.

Minor adjustments made to ensure fitting.

Susan applies some finishing touches.

Susan applies some finishing touches.

Second half of tablet is laid.

Second half of tablet is laid.

Aligning both halves.

Aligning both halves.

Hey Presto!

Hey Presto!


Phase 3: Painting and Planting

The Tablet planted up and shingle path installed.

Herbs arranged between the spokes.

The beginning of planting of the other side of the path.


Refurbishment

Due to weathering and age the herb wheel rotted in the center over the winter - work was undertaken to refurbish the center of the wheel with a stone replacement.

Paul sets to work levelling the centre stones.

Paul sets to work levelling the centre stones.

The replacement stone centre.

The Herb Tablet as of 25/03/12

The Herb Tablet as of 25/03/12.

As of 1st August 2016 the Herb tablet has now rotted around the outside and we plan to refurbish this with brick.

14/10/16

31/10/16

Susan finishing the herb wheel

26/11/2016


Greenhouse

As of 2016 the greenhouse has been cleaned up for use.
The herb wheel is past its best and we plan to create a brick surround.